Get in touch
Solar EPC
At Radiant Greens Solar, we provide end-to-end Solar EPC solutions, ensuring a seamless transition to clean energy. From designing and procuring top-tier solar components to installation and grid integration, we handle every aspect with precision and expertise.
With years of industry experience, we deliver cost-effective and high-performance solar solutions, helping businesses and homeowners harness the power of the sun for sustainable energy and long-term savings.
1. Residential Solar
- Power your home, shrink your bills, and make your rooftop the envy of the neighborhood. Bonus: No more blaming the kids for leaving the lights on.




2. Commercial Solar
- Run your business like a boss… with lower overhead costs. Solar panels work overtime so you don’t have to. (No coffee breaks needed.)




3. Solar Battery Storage
- Keep the lights on even when the grid goes down. Because let’s face it, power cuts are just inconvenient (unless you're looking for an excuse to ignore work emails).




4. Solar Maintenance
- We keep your solar panels clean and efficient. Unlike your gym membership, we actually provide results.




How much maintenance does a solar system require?
Solar panels require minimal maintenance. Regular cleaning and annual inspections ensure optimal performance. Inverter and battery systems may require periodic servicing.
Can solar panels work during cloudy or rainy days?
Yes, but solar power generation decreases on cloudy or rainy days. However, modern panels can still generate electricity under diffused sunlight. A battery backup or net metering system ensures continuous power supply.
Will my solar system work during a power outage?
If your solar system is grid-tied without batteries, it will shut down during a power outage for safety reasons. However, a hybrid system with battery storage allows uninterrupted power supply.
How long does it take to install a solar power system?
The installation timeline depends on the project size and approvals required. A residential solar system typically takes 2-5 days, while commercial or industrial projects may take several weeks.